Front side roof is now shingled, backside is 90% covered. First of the windows arrived on site today and four have been installed at the front of the house. First floor windows have been removed and are ready for framing modifications to accept the new ones. Deck footings were placed today and covered.
Rear deck footings. |
Front porch footings from second floor. |
Master Bedroom windows installed. |
View of laundry room and stair opening. |
Attic with last bit of roof sheathing to do. |
Old naster bedroom, new family room windows removed. |
Living room window removed. |