10/14/2013: DAY 100

We are at Day 100.

Columbus Day weekend.  Canadian Thanksgiving. Fall clean up.  Yeah, none of those things are happening for us.  Well, we treated ourselves to dinner at Red Robins on Monday if that counts for anything.

The real focus is on getting into the house.  We took advantage of the relatively warm weather with afternoon temps bumping against 70 degrees and got some paint on the exterior door trim and more importantly got most of the porch deck boards installed.  Shauna and Norah were even able to get the timber oil on the mahogany boards so we're all sealed up.  The office got a good clean out and final prep work and is ready for wall paint.  The ceiling was primed and one coated.  The back basement stair is now finally painted.  Attic door also final painted which completes the upstairs painting with the exception of the final base board coat (yet to be installed) and touch ups.

Discovered that the verizon fiber ONT was installed by Verizon in front of the electrical panel and has to be relocated.  Verizon is scheduled to be on site 10/15/13 to take care of that.  Just in time for final electrical inspection.

Tim continues with the LR/DR wood floor and began prepping for the stair work scheduled to start Wednesday 10/16 if the floor goes well.

We've got a neighbor who is interested in the camper so we're trying to sort that out this week. We are figuring on getting that camper out of here soon.......since the weather lady mention a four letter word this morning.....SNOW!


The crew hard at work

Get that saw dust out of there

Measure twice, cut once. (Usually not at the same time).

Union required break time.

Roddie checking out the results. Norah's making a punch list.

I'm so proud of myself.

The kids made a stage in the yard with the cut offs.

The big stage.

Office ready for paint.

New front door with painted trim and sealed deck boards.