Tim got the master exhaust fan vent connected so we are free to use the shower. Also the attic furnace has been started now that final power is here and is fully operational. Second floor is now heated although we still need to connect the downstairs thermostat. Stair tread finishing is completed and installation should commence later next week after several days to allow for a good cure on the finish. Tim intends to begin
Also completed were replacement of the rusted duct in the furnace room where the old in operable humidifier was. Plumber has cut & capped the supply line for the humidifer as well as the water and gas for the old washer and dryer in the basement.
The downstairs interior door painting is completed with only the kids bedroom closets left. Eight more windows need their final coat of paint. once these are done the window/door/trim paint will be complete. Next up on the list is to paint office and basement stair walls and ceilings and install the porch deck boards and prep the front sidewalk for concrete.
NGrid hooking up permanent service |
Final Service connected. Temp power pole to be removed. |
Temp electrical to camper has now been removed |
Stair treads completed and curing |
washer and dryer ready to connect |
Heat upstairs! |
Existing W/D gas and cut & capped above ceiling in basement |
Rusted ductwork removed and replaced in furnace room |
Old humidifing unit removed. Pretty scary that this was in the ductwork. |
sample of the carpet of dirt/dust/debris on bottom of return. |
Goodbye Maid-O-Mist |