Friday, September 27, 2013

9/26/2013: Day 82 - Finish Fixtures

Finish plumbing fixtures are well in progress now.  The kids bathroom appears to be completed, with the vanity, sinks, sink faucets, shower trim, and water closet in place.  The master bathroom is not far behind.  Sink and water closet are in the half bath downstairs.  Tile work continues with cut tiles installed in upstairs bathrooms. Cut tiles are ready to be installed in half bath and foyer downstairs.

Furnace is now connected in attic and looks to be almost ready for start up. Ductwork in attic is also in place.  

All interior window and door trim is finally sanded and ready for caulk and paint. First floor spaces are prepped and ready to receive primer and or paint.  Looking for a big production from the painting subcontractor, MacSchweitzer Painting.

Roddie is very excited and telling anyone who will listen about "his" new light switch in his bedroom.  Norah gave Jack, the neighbor boy, a tour of her bedroom yesterday.  I don't think I'm very excited about that one.  
Foyer cut tiles prepped and ready for install.


New furnace in attic serving new second floor spaces.

New furnace and ductwork.

Kid's Bathroom with faucets installed.

Kid's Potty.

Kid's shower/bath trim.

Foyer lighting installed.

Master bath shower/bath trim.

Master bath vanity