Plumbing and electrical rough in work has continued this week. Rough electrical inspection occurred today and apparently there were no issues. Rough plumbing scheduled for day 38. The new tub and showers arrived on site and tubs are in place. Tim picked up the new front door and the framers returned. The new door was installed, and very unceremoniously replaced with the old one. This is to so the new door slab does not get damaged during the construction activities. This allowed the framers to complete the siding at the front porch. The rear deck framing was installed today.....A little crooked, but the clerk of the works is on that case.